Vietjet Air’s First Eol Check To Sepang Aircraft Engineering
Sepang Aircraft Engineering is proud to have successfully completed C04, 6 years, 12 years Checks and End of Lease checks for Vietjet Air. The aircraft was successfully transition back to the Lessor and was immediately leased to the next operator.