Chinese_simplified English French German Thai Vietnamese
VIETJET AIR’S FIRST EOL CHECK TO SEPANG AIRCRAFT ENGINEERING
PDF
Print
E-mail

Sepang Aircraft Engineering is proud to have successfully completed C04, 6 years, 12 years Checks and End of Lease checks for Vietjet Air. The aircraft was successfully transition back to the Lessor and was immediately leased to the next operator.

 
SEPANG AIRCRAFT ENGINEERING COMPLETES 2 A320 C CHECKS FOR THAI VIETJET AIR
PDF
Print
E-mail

Sepang Aircraft Engineering had successfully completed C04 check and landing gear replacement for Thai VietJet in March 2016. Subsequently, Thai VietJet awarded SAE another aircraft for C01 check in September 2016.

 

 

 

 
CEBU PACIFIC’s SEAT RETROFIT PROGRAM IN SEPANG AIRCRAFT ENGINEERING
PDF
Print
E-mail

Sepang Aircraft Engineering had completed its very first seat retrofit program by installing Geven Piuma Evolution Seats on 2 Cebu Pacific’s aircrafts. This retrofit reduces the total seat weight per ship-set significantly. This reduction of weight will reduce fuel consumption and provide fuel savings.

We are grateful for the opportunity to perform the seat retrofit program Cebu Pacific.

 
SEPANG AIRCRAFT ENGINEERING PERFORMS C05 CHECK FOR AIR CALEDONIE INTERNATIONAL
PDF
Print
E-mail

Sepang Aircraft Engineering had carried out a C05 check for Air Caledonie International in June 2016, and was released under EASA part 145.

 
<< Start < Prev 1 2 3 4 5 6 7 8 9 10 Next > End >>

Scroll Up